Temporary solution on site – Bouygues Construction

GCK ENERGY

Bouygues Construction – Construction site

The brief: Bouygues Construction wants to find an alternative to the use of generators on their worksites. The objective is to reduce CO2 emissions.

The answer: The installation of our 200kVA / 300 kWh mobile container allowing:

  • A connection to the network (limited) to erase the peaks during the power calls of the cranes.
  • Disconnection from the network to supply the site independently and reduce the use of generators (noisy and polluting).