Vehicule charging – Total Energies

GCK ENERGY

Need on highway road networks

The brief: A need to strengthen the charging solution on the APR and Sanef group networks at 6 highway rest areas.

The answer: Installation of a 70 kW double charging station coupled with a 200kVA/300kWh energy container to compensate the limited power of the available networks.